Project:  Olathe Fire Station Addition & Renovation
Location:  Olathe, CO
Owner/Designer:  Olathe Fire Department / Kraii Architecture
Cost:  $1,201,885.00
Completion:  April, 2014

Scope:  The Olathe Fire Station Addition & Renovation project was an 6,800 SF, 2 story, addition to the existing 1600 SF facility.  The new addition includes a new engine and ambulance garage along with sleeping quarters, offices, a conference room, rec. room, kitchen and new rest/shower rooms. KGCI also completed the exterior renovation to the existing facility.

"The Key to Our Success is Based on the Diversity of Our Projects & People"

Project:  Surface Creek Family Practice (Delta Satellite Office)
Location:  Delta, CO
Owner/Designer:   SCFP / Wagner/Galloway Architects
Cost:  $1,021,000.00
Completion:  May, 2010

Scope:  The Delta Satellite Office for Surface Creek Family Practice is a 5,500 stick framed, stucco, and stone facade medical facility.  This project has a state-of-the-art electrical and mechanical system, utilizes natural day lighting through out the entire structure, and includes the installation of high-end finishes.  This facility helps meet the growing needs of out patient medical care throughout Delta County.

Project:  Cedaredge Elementary School
Location:  Cedaredge, CO
Owner/Designer:  Delta County School District / Reilly Johnson Architecture
Cost:  $8,764,328.00
Completion:  August, 2012

Scope:  The 2 story, 37,000 SF addition includes new classrooms, offices, cafeteria/kitchen, restrooms, and new mechanical and storage rooms. Besides the addition, KGCI also completed a 21,000 SF interior and exterior remodel of the original historical school facility that was completed in 1922. The project is LEED Gold Certified and was the 2nd school facility on the Western Slope to be Certified LEED Gold by USGBC.